New service from NPO TechnoDar

Vessel Technical Condition Report

Professional inspection and diagnostics of ship systems with a detailed equipment condition report

1000+

Vessels served

18 years

Of experience at sea

100%

Quality of verification

What do we check during inspection?

The work consists of 6 key stages of checking the systems and equipment on the vessel

Fuel flow meters

Checking flow meters of main engines, diesel generators, and boilers. Assessing wear and tear on mechanisms.

Fuel level sensors

Diagnostics of sensors in reserve tanks, checking the accuracy of measurements and calibration

Data collection systems

Inspection of on-board controllers, operator panels and data recorders

Electrical equipment

Checking current transformers, cable connections and sensor connections

Pipelines and fittings

Inspection of the condition of fuel lines, bypass valves and connections

Shipborne ISU TS systems

Testing integration with ship control and monitoring systems

Completion time: 3 working days

Day 1: Preliminary study of fuel flow charts and assignment of an employee for on-site work
Day 2: On-site work of an engineer at the facility
Day 3: Data processing and digitization, analysis and report preparation by the chief engineer

Important: The period of inspection (summer/winter) does not affect the quality and result of the work.

Inspection methodology

Step-by-step work process at each stage

Preparing for the inspection

  • Obtaining fuel diagrams for a vessel

    Obtaining fuel diagrams for a vessel

  • Preliminary analysis of systems

    Preliminary analysis of systems

  • Determination of inspection methods on board a vessel

    Determination of inspection methods on board a vessel

  • Assigning a specialist for a visit

    Assigning a specialist for a visit

  • Coordination of date and time of inspection

    Coordination of date and time of inspection

Work on a ship

  • On-site work of an engineer at the site

    On-site work of an engineer at the site

  • Inspection of all control and measurement systems

    Inspection of all control and measurement systems

  • Study of fuel lines

    Study of fuel lines

  • Photographic recording of equipment condition

    Photographic recording of equipment condition

  • Collecting data for further analysis

    Collecting data for further analysis

  • Working with the crew and company representative

    Working with the crew and company representative

Analysis and report preparation

Data processing:

  • Digitization of collected data

    Digitization of collected data

  • In-depth analysis of fuel systems

    In-depth analysis of fuel systems

  • Comparative analysis of documents with inspection results

    Comparative analysis of documents with inspection results

Generating a report:

  • Development of a preliminary project

    Development of a preliminary project

  • Determination of the equipment composition in several variants

    Determination of the equipment composition in several variants

  • Drawing up proposals for modernization

    Drawing up proposals for modernization

  • Coordination with the customer

    Coordination with the customer

  • Making edits and approval

    Making edits and approval

Sequence of work

01

Analysis of the data obtained

A detailed study of all collected materials, photographs, and system readings

02

Development of a preliminary project

Preparation of a preliminary inspection report with recommendations

03

Report draft approval

Presentation of the draft to the client for discussion and adjustments

04

Finalization of the Inspection Report

Making amendments and final approval of the inspection report

Trusted by industry leaders

What does the report include?

A complete package of documents with a detailed analysis

Inspection report

  • Vessel information (name, type, owner, flag)

    Vessel information (name, type, owner, flag)

  • Date and place of inspection

    Date and place of inspection

  • List of tested equipment with models indicated

    List of tested equipment with models indicated

  • Photos of installed systems and equipment

    Photos of installed systems and equipment

  • Description of the current state of each element

    Description of the current state of each element

  • Identified defects and deviations from the norm

    Identified defects and deviations from the norm

Photo materials

  • Flow meters for main engines and diesel generators

    Flow meters for main engines and diesel generators

  • Fuel level sensors in tanks

    Fuel level sensors in tanks

  • Data acquisition systems and controllers

    Data acquisition systems and controllers

  • Condition of pipelines and fittings

    Condition of pipelines and fittings

  • Operator panels and monitors for ship systems

    Operator panels and monitors for ship systems

  • Detected defects and problem areas

    Detected defects and problem areas

Technical report

  • Evaluation of the performance of the control system

    Evaluation of the performance of the control system

  • Analysis of the accuracy of measuring equipment

    Analysis of the accuracy of measuring equipment

  • Evaluation of wear of flow meter mechanisms

    Evaluation of wear of flow meter mechanisms

  • Checking the condition of cable connections

    Checking the condition of cable connections

  • Diagnostics of sensors and current transformers

    Diagnostics of sensors and current transformers

  • Possibilities of integration with ship systems

    Possibilities of integration with ship systems

Recommendations

  • List of equipment requiring replacement

    List of equipment requiring replacement

  • Necessary repair and restoration work

    Necessary repair and restoration work

  • Recommendations for sensor calibration

    Recommendations for sensor calibration

  • Proposals for system modernization

    Proposals for system modernization

  • Assessing the feasibility of repair or replacement

    Assessing the feasibility of repair or replacement

  • Prioritization of work by degree of criticality

    Prioritization of work by degree of criticality

Our experience

Why do people trust us?

Extensive experience in installing, commissioning and servicing marine systems worldwide

1000+

Vessels served

River and sea fleet

18

Years on the market

Since 2007

24/7

Support

Consultations and services

Whole world

Geography of work

All over the world

Certified specialists

Our engineers have extensive experience working with fuel monitoring, inventory measurement, and vessel automation systems. Regular training and knowledge of the specifics of various vessel types guarantee high-quality inspections.

Cost of the service

Transparent pricing without hidden fees

Comprehensive inspection of the vessel

Full system diagnostics with a detailed report

from110 000 ₽

+ logistics costs

The price includes:

  • Departure of specialists to the vessel

    Departure of specialists to the vessel

  • Comprehensive inspection of all systems

    Comprehensive inspection of all systems

  • Detailed inspection report

    Detailed inspection report

  • Technical report

    Technical report

  • Photographic materials and diagrams

    Photographic materials and diagrams

  • Repair recommendations

    Repair recommendations

  • Troubleshooting Plan

    Troubleshooting Plan

  • Consultations with specialists

    Consultations with specialists

Logistics costs are calculated individually depending on the vessel’s location. We are ready to travel to any point in the country.

Order a vessel inspection

Fill out the form and we will contact you within an hour

Даю согласие на обработку персональных данных